Info:

Title: ROME’S MOSAIC - Code: 00027
Contest: Rome / 2010
By: J. Galindo / E. Varas / H. Sanz / J.L. Sánchez-Fortún / N. Martinez / A. de Moura / A. Riera

Views: 2562 Likes: 0

Votes:

JUERGEN MAYER H. 0
FRANCESCO LIPARI4
FELIPE ESCUDERO2
FRANCESCO GATTI 6
MICHAEL CATON 5


3.4

ROME’S MOSAIC

ROME’S MOSAIC

The city of Rome is currently built throughout a juxtaposition of big bags, urban network, monuments and hills placed on top of the land, generally joined in a non continuous structure of public space. Rome has experienced a huge growth of its suburbs over the years. Therefore Rome has become a city where the majority of its activity takes place in the centre of the town concentrating all of its history and culture over there but lacking a good communication with the rest of the city. That is why, we propose corridors of activity.

SWITCH ON THE EDGE

There are some holes between the edges of these big urban bags. The city has miles and miles of edges without any continuity of its public space and without a relationship with its activities that would guaranty the urbanity. The solution it is found on how we work with these edges.

A topic that rises from this reflection is the critical distances between edges. The kind of work will depend on the shapes and functional transformations of empty space. These distances enable a chain of all kind of interventions that can work out in different ways along the city.

The goal of the initiative is to give action to the public space created among the architectures. An option is to work with new architectural projects, to create urbanization, to reinvent Rome´s landscape and to ensure a stable and innovative urban comfort. Those are the main tools to work with the edges but the method can vary as the edges are not the same ones all the way. They can have different grades of brushing and distances that will tell the intensity and frequency of the urbanity.

We have chosen an exemplary part of the city that goes from the centre to the suburbs. From the Tevere’s river to the Cristobal Colombo’s infrastructure, along Roman’s Foro, Circo Maximo and Caracalla’s Thermal baths.

CUTTING THE CITY

To sum up, we propose a city cut, where it is possible to understand the city as a hole, chained continuously by history, culture, nature and modernity. We present Innovation and sustainability. A chain of new uses and architecture shapes that respect and understand all times.

We analysed different frictions, and propose five interventions.

1._ The water square. We suggest a square on top of the Tevere river that will allow to connect the city level with the river level throughout a new communication of the Tiberina island from the Polatino bridge. We propose the creation of platforms and swimming pools with leisure activities related to the water and a green space that would allow these suggested connection between the city and river levels.

2._The eco-store, located between the Roman Foro and the Maximo Circus, would be situated parallel to the Foro space as if it was a habited wall. This way we will give a new activity related with Maximo Circus. We propose a new wave of activity with the creation of an architecture that will be unfold as if it was a tape. Though this tape we will put a new urban space with different levels that will give a new visual image to the Foro at the same time that will allow the creation of new activities and little businesses. This will offer more urbanity to the public space in contact with the Maximus Circus.

3._ Flowing to Caracalla. Afterwards we suggest a water path to connect that area to the Caracalla´s Thermal´s bath. We will create an urban park that enriches the public space with vegetation and new places for walks and leisure.

4._Then we will create the Crazy Path with the objective of generating new meeting points, concentrating the activity in them across a long platform. We suggest to build new architectures (like strategic stops) located in specific places with studied distances between them that will interconnect them with the urban platform.

5._At the Ponte Vecchio we suggest to save the gap to give a new view of this bridge. We propose to put a new design centre to one side of the bridge through a non lineal access but with an oblique one creating different leaning levels that will take us until the countryside. These new platform will create a new public space allowing new activities related to the structure in connection with the landscape opening the doors to the Roman land.

Info:


Title: ROME’S MOSAIC

Time: 16 marzo 2010
Category: Rome
Views: 2562 Likes: 0

Tags: -

slot gacor Situs slot gacor
demo slot gacor
slink slot gacor
situs toto
slot gacor
link slot gacor

toto
situs gacor hari ini
slot gacor deposit 5000
situs toto
slot gacor
brenjitu
slot
situs toto
slot gacor hari ini
situs toto 4d
situs toto
slot demo
link slot gacor
situs slot gacor
slot gacor gampang menang
slot gacor hari ini
slot88
slot gacor hari ini slot gacor slot 88 slot gacor brenjitu toto 4d situs toto toto 4d situs toto situs toto
slot online
slot
slot gacor
situs slot gacor
slot online
slot online toto toto situs slot gacor toto situs slot gacor toto togel online brenjitu toto togel slot x15000 togel online situs togel slot online bandar toto macau sydney lotto slot pulsa hongkong lotto slot pg togel lotto slot gacor brenjitu brenjitu brenjitu togel online keluaran hongkong situs slot gacor
BRENJITU
BRENJITU
slot online
togel online